Step 1: Contact your local SEO for soil the moisture check. Tubing can only be installed in dry soil conditions. Note: tanks may be installed prior to the drip system installation. Step 2: Rent the proper machine for tubing installation. A vibratory plow is required for in ground installations; no cable pullers. Step 3: Using an elevation control method, layout …
PercRite® Micromound Installation Photos: Step by Step
Step 1: SEO to perform soil moisture test. Once dry enough, establish area and scarify (on contour) to a depth of 6-8″. Step 2: On contour sand placement. See design for depth of sand. Step 3: Tubing placement. 6”-9” on center. Refer to your design for length and spacing specifications. Step 4: Secure tubing in place with landscaping staples or …
Drip Installation: Hydraulic Units and Control Panels
Drip Installation: Layout and Tubing Installation
Drip Installation: Manifolds and Loop Ends
Drip Installation: Remote Zone Valve Installation
Drip Installation: Septic & Pump Tanks
During the installation of a drip dispersal system, we come across many different tank configurations. Here are photos from a number of installations.
Lake County Perc-Rite Installation Video
Local Codes may call for additional inspections and slightly different equipment requirements. The following video provides an overview of the installation and operations of an American Manufacturing Perc-Rite® system in Lake County, Ohio.
PA Micromound Design Review Guide
Large Scale Drip Wastewater Plant Gallery
To browse the photos in this gallery, use the arrows at the top-left side of the image!
- Page 1 of 2
- 1
- 2