PA Micromound Installation Inspection Guide

PeterInstallation

What is a Micromound?

On Contour at-grade bed with:

  • Sand (8-12″)
  • Netafim Drip Tubing
  • More Sand (2″)
  • Soil (12″)
  • Alt Text
  • Alt Text
  • Alt Text

When is a Micromound Used?

  • When slopes are between 0 and 15 percent
  • When soils are greater than or equal to 10″ to SHWT and 16″ to rock
  • When there is sufficient length to contour

The American Perc-Rite Alternate Listing

In this listing PA DEP specifies the design, permitting and installation requirements.

  • Alt Text

Permitting Requirements

SEO may issue the permit if he/she has completed a department sponsored training course on this specific technology or received review delegation in writhing from the department. If neither of these occur the design must go to your regional department for review and comment before issuing the permit.

 Manuafacturer’s Representative’s Responsibilities

They must be present to oversee the installation of the system until the installation contractor has completed a training course (usually field experience); and has successfully installed a sufficient number of drip micromounds under the direct supervision of the manufacturer’s representative.

SEO Installation Inspection Responsibilities

  • Ask “Are you a certified installer?”
  • Verify this with the manufacturer’s representative
  • Very Important: Just because the manufacturer’s representative is on site, this does not excuse the SEO from proper inspection of the system installation.

Two different listings exist for the Micromound:

  1. American PERC-RITE micromound
  2. JNM_ACT SAS mound drip

Components included in a design package must meet the components during installation.

Listings for AMC and JNM are separate and distinct for that reason.

KEY POINT: Make sure that the equipment that goes in the ground matches what is called for the design.

Typical Micromound Layout

  • Alt Text

Split Mounds

  • Alt Text

Other Configurations

  • Alt Text
  • Alt Text
  • Alt Text

Profile of a Micromound

profile-micromoundmicromound-layout-tubing-area3 Bedroom = 100′ X 16′

4 Bedroom = 125′ X 20′

5 Bedroom = 150′ X 20′

Completed Installation

  • Alt Text

The Stakeout Inspection

– Typically is done before permit issuance

– The micromound must follow the contour of the land

stakeout-inspection

**proper stakeout inspctions can prevent situations like this

stakeout-inspection-2

Stakeout helps with sand placement and depth verification

  • Alt Text

Soil Moisture Inspection

SEO Inspection

  • Area may not be scarified until a soil moisture test has been completed
  • Soil must crumble at the 6″-8″ plow depth
  • Must prevent soil “smearing” (just like an elevated sand mound)

Scarification

Purpose

  • Roughen the surface to allow for better infiltration into the top soil
  • Provide a more transitional contact between the sand and soil

How To

  • Most preferred : chisel teeth mounted to backhoe (great around stumps)
  • Next, chisel plow behind a tractor (open sites)
  • Last, backhoe bucket with sharp teeth (time consuming)
  • Important: Rototillers are prohibited

Key Point: Scarification must be with the contour of the land.

What to Scarify

Entire basal area

tubing-area

  • Alt Text
  • Alt Text
  • Alt Text
  • Alt Text

Scarification is complete

  • Alt Text

The Site is Prepared

  • Alt Text

Sand Placement

The sand specification is found in the alternate technology listing.

  • Alt Text

This is not the same as an elevated sand mound

  • The alternate listing sand specification for micromounds is the same as the sand used for sand mounds except <5% should pass through the #200 sieve.
  • The alternate listing state that cement concrete sand type A or ASTM C-33 concrete sand is preferred.

 Different Types of Sand

  • Alt Text
  • Alt Text
  • Alt Text

The Sand

  • Once the site is scarified, the sand must be placed before it rains
  • The sand must not be mixed, but applied so it naturally fills the voids
  • The sand must be placed with a backhoe and leveled
  • This is not a flat topped sand bed, it is to be even, along contour and sloping with grade

Depth of Sand Inspection

Sand depth is specified in the design:

8″ = Secondary Treatment

12″ (or more) = Septic Tank Effluent

  • Alt Text
  • Alt Text

Sand Bed Depths

micromound-layout-sand-depth

  • Alt Text

The Contractor will begin to place and spread the sand

  • Alt Text
  • Alt Text
  • Alt Text
  • Alt Text

After the sand placement is complete the sand depths should be verified by the SEO

  • Alt Text
  • Alt Text

Don’t Forget

  • Micromounds are on contour low profile mounds (their tops should not be flat!)
  • All mounds must be constructed with minimum 3:1 berms (other than the down sloping sand berm)

Tubing Placement Inspection

Design must specify:

  • Number of tubing runs
  • Length of tubing runs
  • Spacing between the tubing runs

Netafim Tubing

Only tubing manufactured by Netafim has been shown to meet the requirements of the alternate listing. No substitutions of other drip tubing is permitted.

  • Alt Text

Run= Length of Tubing Across Contour

  • Alt Text
  • Alt Text

As per the alternate listing:

Tubing Spacing = 6″ – 9″

(as specified by the designer)

  • Alt Text

Tubing Spacing

SEO’s must verify:

  1. Number of runs
  2. Length of runs
  3. Spacing between runs
  • Alt Text

At This Point

  • The alternate listing directs the SEO to the specifications provided by the manufacturer.
  • Some of the following items may be manufacturer’s specifications, not clearly stated in the alternate listing. I will decipher between the two when possible.

Cold Climate Installation Techniques

  • Alt Text

Lateral = One or more runs looped together

  • Alt Text

The Loop Ends

Must be elevated with 2″ with pressure treated wood, bricks, or firm sand bed.

  • Alt Text
  • Alt Text
  • Alt Text

Manifold Construction

Manifolds are used to deliver the effluent to a zone from the tanks via the supply lines.

manifold-construction

Top Feed Manifolds

  • Alt Text

Side Feed Manifolds

Typically for slopes <5% slope

  • Alt Text
  • Alt Text
  • Alt Text

Cold Climate Installation Techniques

  • Alt Text

Verify Depth of Conveyance Lines

Must be below local frost line (typically 3′ below grade)

  • Alt Text

Cold Climate Installation Techniques

  • Alt Text

After the mound is installed, but before start up, the contractor must:

  • Install septic tank
  • Install pump tank and components
  • Install hydraulic unit (central unit)
  • Install supply and return lines to the mound
  • Install and wire control panel

Septic Tank Inspection

No different than your standard septic tank inspection

  • Primary treatment (>/=12″ sand)
  • Concrete tanks must be dual compartment rectangular or 2 rectangular tanks in series
  • And/or, must conform to meet the requirements of section 73.31
  • Cylindrical tanks meeting section 73.31 may also be used
  • Vertically aligned circular (round) tanks are not permitted

If Secondary Treatment is necessary due to an 8″ sand bed depth

The permit application must include a letter from the drip system manufacturer stating that it is compatible with the PERC-RITE drip micromound

Septic Tank Installation

  • Alt Text

Check the design for an effluent filter requirement

this is recommended, not required

  • Alt Text

Pump Tank

1,000 Gallon- 2,000 gallon for residential

The working volume >=60% design flow

  • Alt Text

Requirements of the Pump Tank

  • Audible and visual high-water alarm set with 25% of the peak daily flow as reserve volume above the high water alarm
  • Low-water cutoff device (the off float) to prevent damage to the pump during low water conditions
  • This float should be separate from the timer enable device (the dose float)
  • A watertight access to grade is required (VERY IMPORTANT)

Pump Tank Innards

  • Alt Text
  • Alt Text
  • Alt Text
  • Alt Text

Hydraulic Unit Specifications

As per the Alternate Listing:

  • 2 disc filters are required
  • They must backflush independently of each other
  • The residual water must return to the head of the pretreatment train.- Sometimes you will see it return to a settling tank or the first compartment of a dual compartment dosing tank.
  • The Hydraulic Unit must be protected from freezing temperatures (i.e. heater strip with thermostat).

Hydraulic Unit

  • Alt Text

Other H-Unit Placements

  • Alt Text
  • Alt Text
  • Alt Text

Daylight Drain the Hydraulic Unit

To grade or into a French drain

Cover end with slotted cap to keep out rodents

  • Alt Text

Supply & Return Lines

  • Alt Text

Conveyance lines feed the top feed or side feed manifolds

  • Alt Text
  • Alt Text

Air Release Valves

Purpose:

  • The help the system to quickly pressurize when the pump turns on
  • To help the system’s tubing to quickly drain when the pump shuts off.

Location:

  • Top Feed: one on both the supply and return manifolds (higher than the highest piece of drip tubing for that zone)
  • Side Feed: one on each of the return lines (higher than the highest piece of drip tubing for that zone)
  • Alt Text

Top Feed Example

  • Alt Text

Side Feed Example

  • Alt Text

Before Finish Grade

  • Alt Text

Final Grading

Manufacturer’s Recommendation

  • Alt Text

Control Panel

Installed on home or installed in field

**panel must be 3′ minimum above ground

  • Alt Text
  • Alt Text

Wiring Performed by Electrician or Experienced Contractor (see local code)

Ground control panel locally via a ground rod or an approved grounding method.

  • Alt Text

Is an Electrical Inspection Required?

Installation is Complete:

  • System should be uncovered for the system start-up inspection. This includes:
    • PVC SCH40 supply and return lines
    • Manifold Connections
    • Loop ends
    • All other pressurized plumbing

Time For System Start Up Inspection

  1.  Performed by the manufacturer’s representative. SEO should be on site.
  2. The system is pressure tested for leaks, clogs and proper amount of tubing.
  3. Upon a successful start-up, the system can be covered.
  • Alt Text

Start Up Rates To Record

Dosing Rate

  • The amount of effluent discharged from the emitters based on the amount of tubing on the mound
  • Gallons Per Minute
    • Too fast= leak or too much tubing
    • Too slow= clog or not enough tubing
  • Must be +/- 10% of the design calculation

Additional Rate to Record

Field Flush Flow Rate

  • The rate at which the tubing is flushed
  • Expressed in gallons per minute (GPM)
  • Must meet, or exceed, the design minimum

Cover and Final Grade Inspection

Verify Sand Cover

  • Alt Text

Verify Geotextile Layer

  • Alt Text

Verify Mound Cover

  • 12″ of suitable cover over the top of the micromound
  • 8″ of suitable cover over the sides and shoulder of the micromound
  • Cover the downloping berm and extend the toe
  • Alt Text

Final Grade Inspection

Surface water must move away from the micromound (and tanks) and may not accumulate on top, or up slope, of the mound

final-grade-inspectionVegetation

  1. The area must have seed and straw immediately to avoid erosion
  2. Sod is recommended
  3. Aggressive turf must be established and maintained
  4. Erosion control may be necessary on some sites with steep slopes.
  • Alt Text

Look for Good Winter Cover

Thick winter cover of straw or mulch is necessary for late Fall installations.

  • Alt Text
  • Alt Text

A Good Winter Tank Protection

  • Alt Text

Protection

Remind the installer that good fall protection will protect against harsh winter weather

Cold Climate Installation Techniques

  • Alt Text

If it is on the Design, it Must Happen

Examples

  • Curtain drains
  • French drains
  • Effluent filters
  • Tank coating
  • Drain to daylight

After the System Startup

30 Day Homeowner Meeting

The Manu. Rep. must meet with the property owner within 1 month of system start-up and/or occupancy of the dwelling (and with the SEO upon request.)

  • Instruction of system operation and maintenance
  • Locations of all parts of the system
  • Caution notice regarding zone disturbances
  • Explain the automatic alarm system
  • Statement requiring that the Manu. Rep. be contacted if the alarm system is activated